OPTIMIZATION OF ENERGY CONSUMPTION

Stop the thousands of euros wasted to burn, heat, cool, air-condition. The intervention of ROCHE TECHNOLOGIES has enabled many customers to halve their consumption of electricity, gas, or fuel. Among them, several industrialists were able at the same time to double their production capacity. The Return on Investment corresponding to the implementation of our recommendations is generally obtained over a period of less than 1 year.

BIOMASSE - BIOGAS - SYNGAS

For several years the expertise of ROCHE TECHNOLOGIES has been positioned at the heart of the ENERGY TRANSITION. Our interventions allow substantial gains in gas and steam production while drastically reducing carbon monoxide and dust emissions.



ENGINEERING MANAGEMENT

There are no problems, only solutions! ROCHE TECHNOLOGIES analyses, expertises, and solves any type of problem related to energy consumption and / or combustion. We bring the solutions and accompany you in their deployment.







COMBUSTION and FLUE GAS TREATMENT

have been the core business of ROCHE TECHNOLOGIES since its inception.  
In thermal processes such as incineration, sludge, waste, biomass, biogas or syngas, we have adapted furnaces and boilers to keep their waste load or heat load despite the variation in calorific value due to selective sorting and climatic conditions. At the same time, our interventions reduce both the emission of nitrogen oxides and carbon monoxide, as well as reduce clutches and fouling in furnaces and boilers. Our specific processes favor the absence of use of expensive reagents and more or less dangerous properties. The implementation of our recommendations results in results far exceeding legal standards.

SYTRAIVAL VILLEFRANCHE SUR SAÔNE - FR
2017
Improvements in incinerated tonnage despite increases in LHV.
Testing scheduled for October 2017.
DISTILLERY DEPAZ LA MARTINIQUE
2015-2016-2017
Modification of the primary and secondary air networks and the locations of the air injection nozzles.
Increased boiler availability due to a drastic decrease in clutches in the boiler.
Optimization of steam production to operate three distillation columns instead of two by modifying the combustion parameters and reducing losses. Improved energy recovery on effluents.

CET SOIGNOLLES POUR METHANERGIE
2017
Reconditioning and reassembly of a Biogas filter upstream of the generator.
Definition of new piping for the new chiller and the new condenser.
Purchase of control and cooling equipment.
Reversal of plans, integration of new equipment and modification of piping. Preparation of upstream / downstream biogas connections, hydraulic and electrical.

STEP PIERRE BÉNITE GRAND LYON – FR
2015-2016
Rebuilding the reagent storage in the UF7 building.
Design and maintenance studies. Supply of process equipment.
Coordination of the site. MSI.
Incineration of sludge from STEP

CENTRE COMMERCIAL CORDELIERS - FR
2013 - 2016
Expertise and AMO for TERRANAE.
Energy optimization study and solution proposal.
Participation in the choice of the new operator. Monitoring of the implementation of a first energy optimization implementation step on the hot part.
Follow-up of the implementation of the second phase of energy optimization on the cold part and verification of the hot and cold operation.

DU SIMON DISTILLERY – FR
2015
Detailed study to move a boiler and construct an ancillary building to increase the steam power of the site
CCIAG ATHANOR – FR
2015
Supply and replacement of DeNOx catalysts on lines 2 and 3 of the UVE. Monitoring of catalyst activity.
SHOPPING CENTER SAINT MARTIAL LIMOGES-FR
DEPUIS 2005
2003-2009
Balance sheet in light of the energy optimization 
Operation optimisation 
Aid at the extension of shopping center (air conditioning)
2010-2013
Renovation of cooling towers and energy optimization (energy savings of 20%)
2015
Study of the replacement of gas boilers.

CCIAG LA VILLENEUVE – FR
2012-2013-2015
Compliance DeNOx 2012 G4 implementation for ECOMB.
Tests DeNOx SNCR boiler fuel G2 for the standards 2016.
Compliance DeNOx 2016 G4. Performance G4.

GROUPE TEREOS – FR
2015
Tests and Proposals for combustion optimization solutions. Installation of additional smoke treatment.
STEP AMPHITRIA DE TOULON
2014-2015
Increased steam production by 33%.
Decrease in CO > 1000 to & < 25 ppm CO to 3.5% O2.
Training of staff on new driving.

STEP AMPHITRIA DE TOULON
2014
Reduced leakage of NH3.
Better combustion of sludges from different sources.
Better furnace temperature distribution.
Maintenance of tonnage of incinerated sludge

SIDEFAGE UVE BELLEGARDE
2014
Expansion of reinforced concrete retention and effort recovery.
Installation of a new tank of 30m3 without opening of the building.
Implementation of power supply and control.
Passage from 3 common pumps to 2 pumps dedicated to each of the two boilers.

ENERGY RECOVERY CENTER LYON SUD-FR
2010-2014
2010-2012
Flue gas treatment maintenance and optimization of three incineration waste lines (scrubber, catalyst, heat exchanger)
2013 - 2014
Expertise of dysfunctions.
Repair of GEA FLUCOREX heat exchangers.
Replacement of valves and renovation of scrubbers in SVR.

GRAND POITIERS UVE SAINT ELOI – FR
2014
Installation of tertiary air fans and modification of the driving control
Setting of a speed variation on the secondary air.
Implementation of continuous measurements of injection of lignite coke.
Resumption of alarm unit.

UIOM TOULON - FR
2013
Operating expertise for ZEPHIRE.
Verification of operation.
Emission analysis.
Analysis of operating parameters.
CPCU SAINT OUEN-FR
2008-2012
2008-2009: 
Compliance DeNOx 
Combustion optimisation(for ECOMB) 
Details study and turnkey solutions 
Commissioning 
-Att ended 200 mg 6% O2 - performed <160 
2010-2012: 
DeNox-system maintenance

SIDEC LE GOL, REUNION ISLAND - FR
2010-2012
2010: 
Combustion expertise, flue gas treatment and solutions propositions 
2011-2012: 
Impl ementation and commissioning of DeNOx systems and reduction of CO on a pulverized coal boiler

ECOTUBE SYSTEM FOR FRANCE
DEPUIS 2004
2005: Coordination for achieving DeNOx compliance for Lons-le-Saunier, Bessieres ECONOTRE and for Pontmain Line 2 
2006: Pontmain, Line 2 Energy optimization Econotre 
2006: Injection of sludge Valezan-FR 
2007: MSVI Montargis-FR 
2008: Saint Ouen CPCU-FR 
2008: Besançon MSWI - FR 
2009: Saint Ouen CPCU -FR 
2011: SIDEC, The Gol Island-FR

INARIZ - LAMBALLE-FR
2010
Energy Optimization: process analysis and project
MSWI BESANCON-FR
2009
Compliance DeNOx - Combustion optimization (For ECOMB) 
Details study and turnkey realisation, implementation 
BrumiDeNOx system installation 
Expected 200mg/Nm3/h - Obtained <180mg/Nm3

MSWI PONTMAIN-FR
2005-2006-2009
Compliance DeNOx L1 (For ECOMB) 
- NOx L1: Establishment of a SNCR DeNOx and corresponding storage (2009) 
- Turnkey burner (2005) 
Compliance DeNOx L2 (2006) (For ECOMB)

MSWI LAMBALLE-FR
2008
Stability of combustion for high calorific values and limitation of boiler fouling 
- Site Expertise: Analysis of high calorific values, flow analysis, capacity analysis, analysis of fouling, combustion analysis 
- Tests: combustion stability, reduced fouling, efficiency of DeNOx 
- Offer for an integrated solution

MSWI VITRE-FR
2007-2010
2007-2009: 
Combustion stabilisation with high calorific values and limitation of boiler fouling.
Site Expertise, tests, implementation of BrumiDeNOx system, reduction of fouling of boilers, capacity enhancement in case of household waste with high calorific value.
DeNOx efficiency, NOx <200 mg/Nm3 without chemical additives.
2010: 
Assistance for the implementation and commissioning of the heating network and energy recovery in the plant

MSWI MONTARGIS-FR
2007
Incineration of refuse of sorting / composting 
Compliance of the DeNOx-system 
Optimization of combustion 
DeNOx and increased capacity for high calorific values 
Turnkey construction and industrial commissioning 
Result: 40% decrease in NOx without chemical additives 
Increase in plant capacity > 10%

MSWI VALEZAN-FR
2006-2007
Mise en place clés en main d’un système de co-incinération de boues par injection directe dans le four. 
Optimisation de combustion et MSI. 

MSWI LONS LE SAUNIER-FR
2005
Turnkey solution : DeNOx compliance and installation of a start-up burner
MSWI BESSIERES ECONOTRE-FR
2005
Compliance DeNOx (for ECOMB) 
Project Management 
Turnkey installation 
Results: NOx <180mg/Nm3 no chemical additives 
Rated capacity of the plant obtained again after implementation of Ecotube 
Decrease in fly ash, power consumption and water consumption

MSWI CHAMBERY-FR03
2004
Introduction of perforated plates in the oven on line 1 
Advices for combustion settings by the commissioning

MSWI MONTBELIARD-FR
2003
Site expertise 
Proposals for optimization of capacity and technical tests 
Results: Increased Capacity> 10%